Process

Image

Prepare Hull Mold for spraying

a27f13_thmb.jpg (5623 bytes)

Hull First Lam

a27f14_thmb.jpg (5519 bytes)

Hull Core

 
 

Hull Vacuum Bagging

 
 

Hull Second Lam

 
 

Deck Sprayed

 
a27f27_thmb.jpg (5625 bytes)

Deck First Lam / Core

a27f40_thmb.jpg (5807 bytes)

Deck Vacuum Bagging

a27f43_thmb.jpg (5936 bytes)

Deck Second Lam

a27f45_thmb.jpg (6220 bytes)
 

Deck painted with Polycor

a27f48_thmb.jpg (5543 bytes)

Hull removed from mold, placed in holding jig

a27f50_thmb.jpg (5824 bytes)

Interior Pieces Lam

 

Interior pieces being pre-fitted inside hull

a27f49_thmb.jpg (5712 bytes)a27f52_thmb.jpg (5047 bytes)

Interior painted with Polycor

 

Interior pieces being bonded inside hull

a27f57_thmb.jpg (5954 bytes)
 
a27f70_thmb.jpg (5066 bytes)

Deck removed from mold

a27f72_thmb.jpg (5045 bytes)a27f73_thmb.jpg (5989 bytes)

Install deck hardware

a27f76_thmb.jpg (3679 bytes)

Bond deck to hull

a27f77_thmb.jpg (5908 bytes)
 
 
 

More Hardware Installed

 
a27f87_thmb.jpg (6064 bytes)
 
 

Keel

a27f104_thmb.jpg (4583 bytes)
 
 
a27f99_thmb.jpg (4557 bytes)

Keel Box

 
a27f30_thmb.jpg (3572 bytes)

Install Keel

a27f107_thmb.jpg (4858 bytes)
 

Install Rudder

 

Ship to Customer & Commission